P1000345_cropThese latest pictures show the progress that has been made towards the end of the first week of the Hall’s refurbishment project.  The small hall floor has been scrabbled out, and through the doors can be seen the tower that’s been used by the AV sub-contractor, CPS, to refit the lighting and wing rails for the stage.

 

  • Small hall floor scrabbled